THE PRO EXPERIENCE
Your jobs. Today’s plan.
Plan each site, protect the full window and keep the evidence.
Hold: rain
35% rain chance at 11:00 AM, over your 15% limit. There isn't time to work and still leave 12 hours 30 minutes for wrap and protection before it (your company rule).
Wednesday, Sep 9
- Work
- Wrap
- Protect
- After the shift
- Over your limit
- 9 AM78°10%Work
- 10 AM79°10%Work
- 11 AM80°35%Wrap
- 12 PM80°75%Protect
- 1 PM80°75%Protect
- 2 PM80°75%Protect
- 3 PM80°75%Protect
- 4 PM80°75%Protect
- 5 PM80°10%Protect
- 6 PM80°10%Protect
- 7 PM67°10%Protect
- 8 PM67°10%Protect
- 9 PM67°10%Protect
- 10 PM67°10%Protect
- 11 PM67°10%Protect
- 12 AM67°10%
Sample scenario, not live weather · rain chance bars are per hour · limits are your company's own
Sun and clouds, dry
Sample scenario, not live weather
- Binding limit
- Rain chance no more than 15%
- Next change
- 11:00 AM CDT
- Now
- Radar at the job: no rain (sample frame 8:58 AM CDT)Nearest station report: sun and clouds, 78°F (sample report 8:51 AM CDT)Sample scenario, not live weather
- Checked
- 9:00 AM CDT · forecast issued 0 min earlier
Assumptions (4) and limits used
- Your company ruleWrap buffer of 30 minutes is your company rule.
- Field check neededAssumes the pavement will be at least 50°F at start. Check at arrival.
- Shop talkMinimum pavement temperature of 50°F is shop talk, not from a data sheet.
- Forecast timingAssumes the forecast issued 0 minutes ago is still current. Official forecasts are reissued at least twice a day and sooner when weather changes; a forecast older than 13 hours is treated as stale.
- Shop talkPavement temperature at least 50°F
- Your company ruleRain chance no more than 15%
- Your company ruleWind gusts no more than 20 mph
- Your company ruleAir temperature at least 50°F
- Your company ruleAir temperature no more than 95°F
ContractorWeather planning margin: 3°F on temperature, 2°F on dew-point spread, 30% rain chance in any hour, 5 mph on wind. Rain counts as expected at 60% or more.
A planning call based on the forecast and the rules shown. It is not a warranty or proof of compliance.
Beyond a single jobsite.
Real regional imagery. Pan and zoom to follow the wider scene. Sample job pins are illustrative; the demo’s work plans use separate fictional weather.
- NowRaining at the job: no (sample radar frame 8:58 AM CDT, 2 min old)Sample scenario, not live weather
- +5 minNo rain in the sample minute timeline, 9:05 AM–9:10 AM; 10% chance that hourSample scenario, not live weather
- +15 minNo rain in the sample minute timeline, 9:15 AM–9:20 AM; 10% chance that hourSample scenario, not live weather
- +30 minNo rain in the sample minute timeline, 9:30 AM–9:35 AM; 10% chance that hourSample scenario, not live weather
- +60 minRain chance stays under 30% through 10 AM (up to 10%)
- +120 minRain chance stays under 30% through 11 AM (up to 10%)
- Rest of todayRain chance 30% or more from 11 AM to 5 PM (up to 75%)
- TomorrowRain chance stays under 30% (up to 10%)
Sample scenario, not live weather. Now and the minute rows are sample values made from this scenario's hours; live radar and station reports are not read for sample job pins.